During load flow studies PV bus is treated as PQ bus when:
- Voltage at the bus become high
- Reactive power goes beyond limit
- Phase angle become high
- All of these
Correct answer: 2. Reactive power goes beyond limit
During load flow studies PV bus is treated as PQ bus when:
Correct answer: 2. Reactive power goes beyond limit